Wednesday, November 5, 2014

#2 bunker

This week we started working on #2 bunker. The sod and sand is all peeled off and we put new drainage in the bunker bottom. We also re-graded the rough in front of the bunker so that surface water will run in front of instead of into the bunker. The bunker itself will not be changing, we are simply re-doing the drainage and moving the bunker faces back down to where they originally were. I've attached some pictures below.

This is the bunker with everything pulled out. You can see that the valley in front of the bunker is more prominent. It looks drastic right now, but once we add topsoil and sod to the rough area it will soften.











A view looking at the green.











Ian

No comments:

Post a Comment